Case Study
| Title: | Follow-Up - General Repair - Survey Construction Company |
| Scope: | Partial Depth Repair |
| Purpose: | Demonstration of Pavemend Materials in extreme cold weather application |
| Location: | Ulaanbaatar, Mongolia |
| Date: | March 30, 2004 |
PAVEMEND STUDY REPORT IN 22 DAYS AFTER TRIAL
Reported by Mr. Sakaba and Mr. Gotou, Suruga Mongol
Date of Inspection: April 21, 2004
Lapse of time after trial: 3 weeks
Ambient Temperature : 9°C.
Surface Temperature: Site A at 7°C.
Please refer to figures 1, 2 and 3.
No crack is observed either on surface or at joint in all the sites A, B and C respectively in 22 days after trial.In addition, no difference is observed in the appearance of each site between those in one week after trial, i.e. on April 7, 2004 and in three weeks after trial, i.e. on April 21, 2004. Please refer to figures 4, 5 and 6.
![]() Figure 1: Checking ambient temperature at Site A |
![]() Figure 2: Checking ambient temperature at Site B |
![]() Figure 3: Checking ambient temperature at Site C |
![]() Figure 1: Site A |
![]() Figure 2: Site B |
![]() Figure 3: Site C |